Quality
Previous Topic  Next Topic 

The quality button applies to the operation which the button relates and is shown in the operation details below.

 

Previous Operation Must Be Complete

Checking this will stop a shop floor operator booking time on to any following operations until this operation has been completed.

 

Print Setup/Cycle Times

Checking these options will print the times on the route card.

 

Lock Operation To Work Centre

This will stop the scheduler moving this operation to a similar work centre in the same group

 

Program ID

Enter the CNC program ID reference

 

CMM ID

The Cordinate Measuring Machine ID for the operation dimension checks

 

Work Aid (fixture)

Enter the fixture reference here

 

Inspection Document

Attach and relecant inspection procedure/instruction using the open folder button

 

First Off Required

Selecting this will force the operator to do a first off inspection before continuing with the cycle. If this is checked then you will have to select the inspection group who are capable of doing the first off.  The groups can be setup under the Employees module

 

In-Process Inspection

Checking this will force the operator to complete periodic quality checks while running the cycle operation. Again you will be required to select an inspection group whi can perform this.